2MVA package sub-stations for BT

Project Overview

Client:
BT

Scope:
HV & LV Switchgear

Kane Engineering has recently completed a major LV switchgear project for BT Northern Ireland at its Belfast Telephone House Data Centre.

The project comprised two 2MVA package sub-stations, each with Mains & Generator 3200A ACB incomers and up to six ACB (ABB E-Max drawout) outgoers on each panel, serving critical equipment within the data centre.

Kane Engineering also supplied and installed the cast resin transformers, close-coupled to each of the form 4 Cubic panels.

Apart from the main LV panels, Kane also supplied two 800A rated Form 4 type 2 sub switchboards; two 630A Automatic changeover panels serving the critical cooling equipment on the data centre level itself, and four PDU's (Power distribution panels).

The PDU's incorporate static transfer switches for instantaneous switching between the two power sources available, 18W TP+N outgoing ways, and the lastest Branch Circuit monitoring systems to track power usage for each rack within the data centre.

The project was completed for local M&E contractor Weir & McQuiston Ltd. during the period January-March 2009, and working with BT's consulting engineer for the project Wallace Whittle.

2MVA package sub-stations for BT Photo Gallery:

  • p1-5
  • p1-4
  • p1-1
  • p1-2

Related Information:

Case Studies

2MVA package sub-stations for BT

Kane Engineering has recently completed a major LV switchgear project for BT Northern Ireland at its Belfast Tel

5000A LV panel for new printing press, Newry

Kane Engineering has successfully completed a major LV switchboard for Independent News & Media Group, for their

New Main LV switchboard for Tayto

Kane Engineering has recently completed a new main LV switchboard for Tayto Ltd - Northern Ireland's best known brand

Latest News

Farrans/EPSE awarded with their first Hydro Turbine Scheme for Scottish Water Horizons (SWH)
17 Feb 2012
EPS Environmental Ltd working together with Farrans EPSE JV, have been awarded t…
PumpPod the latest innovation from EPS Environmental Ltd
27 Jan 2012
PumpPod™ is our latest innovation. It is an intelligent, integrated water …
Farrans/EPS win Wateraid Quiz Scotland
16 Dec 2011
The Farrans EPS team have won the 2011 Scottish Region Wateraid Quiz at the Dunb…
  • Projects
  • Design & Construct
    • Kilmelford WTW
    • Peterhead SPS No. 3
    • Campbeltown WwTW
    • Carbarns WwTW
    • Donnybrewer WwTW
    • Elsrickle and Dolphinton
    • Nant Drive WSZ Booster Pu
    • Garstings Hill WPS
    • Fyvie WwTW
    • Cramptons Road WTW
    • Gartcarron WTW Closure
  • Power, Control & Automation
    • North Coast WwTW Pumping
    • 7 Villages WwTWs Upgrade
    • Castlebar Sewerage Pumpin
    • Waterford WwTW
    • Sligo WwTW
    • Enniskillen WwTW
    • Meath Group WwTW Scheme
    • Killsellagh WTP
    • Campbelltown Sewage Schem
    • Downpatrick WwTW
  • HV & LV Switchgear
    • 2MVA package sub-stations
    • 5000A LV panel for new pr
    • New Main LV switchboard f

Head Office Northern Ireland, Derryloran Industrial Estate, Cookstown, Co Tyrone, BT80 9LU

Scottish Office, Oakbank, Midcalder, Livingston, EH53 0JS

Email: info@epsenvironmental.co.uk, Call:028 8676 1277

Contact EPS Environmental Web Design Northern Ireland by Reflex Studios