Kilmelford WTW

Design & Construct

Kilmelford WTW

Project Overview

Client:
Scottish Water Solutions

Scope:
Design & Construct

Capacity of Plant:
90m3/day

Contract Start Date:
25th February 08

Contract Completion:
December 2009

This scheme in rural Oban consisted of removal and replacement of the existing GAC WTW with new turnkey Nanofiltration Membrane treatment plant.  The MEICA scope of works included:

  • Existing GAC filters decommissioned and converted to form additional final water storage tank.
  • New package filter membrane plant (outflow 90m3/day) capable of the physical removal of natural organic matter without the use of coagulants or other chemicals comprising:
  • Intake screening
  • Lift pumps at the plant outlet.  
  • Relocation/recommissioing of an existing cryptosporidium test rig (from existing treatment building)
  • Upgrade of existing power supply, laying of new supply cable
  • De-commissioning & removal of existing redundant services

Kilmelford WTW Photo Gallery:

  • Kilmelford Membrane Plant 001
  • Kilmelford

Related Information:

Case Studies

Kilmelford WTW

This scheme in rural Oban consisted of removal and replacement of the existing GAC WTW with new turnkey Nanofiltratio

Peterhead SPS No. 3

EPS Environmental as an Associate Delivery Partner for Scottish Water’s Q&SIIIa period was awarded the refu

Campbeltown WwTW

Scottish Water (SW) identified the need for long term investment to reduce the flooding in Campbeltown and storm spil

Latest News

Farrans/EPSE awarded with their first Hydro Turbine Scheme for Scottish Water Horizons (SWH)
17 Feb 2012
EPS Environmental Ltd working together with Farrans EPSE JV, have been awarded t…
PumpPod the latest innovation from EPS Environmental Ltd
27 Jan 2012
PumpPod™ is our latest innovation. It is an intelligent, integrated water …
Farrans/EPS win Wateraid Quiz Scotland
16 Dec 2011
The Farrans EPS team have won the 2011 Scottish Region Wateraid Quiz at the Dunb…
  • Projects
  • Design & Construct
    • Kilmelford WTW
    • Peterhead SPS No. 3
    • Campbeltown WwTW
    • Carbarns WwTW
    • Donnybrewer WwTW
    • Elsrickle and Dolphinton
    • Nant Drive WSZ Booster Pu
    • Garstings Hill WPS
    • Fyvie WwTW
    • Cramptons Road WTW
    • Gartcarron WTW Closure
  • Power, Control & Automation
    • North Coast WwTW Pumping
    • 7 Villages WwTWs Upgrade
    • Castlebar Sewerage Pumpin
    • Waterford WwTW
    • Sligo WwTW
    • Enniskillen WwTW
    • Meath Group WwTW Scheme
    • Killsellagh WTP
    • Campbelltown Sewage Schem
    • Downpatrick WwTW
  • HV & LV Switchgear
    • 2MVA package sub-stations
    • 5000A LV panel for new pr
    • New Main LV switchboard f

Head Office Northern Ireland, Derryloran Industrial Estate, Cookstown, Co Tyrone, BT80 9LU

Scottish Office, Oakbank, Midcalder, Livingston, EH53 0JS

Email: info@epsenvironmental.co.uk, Call:028 8676 1277

Contact EPS Environmental Web Design Northern Ireland by Reflex Studios