Nant Drive WSZ Booster Pump Station

Design & Construct

Nant Drive WSZ Booster Pump Station

Project Overview

Client:
Scottish Water CID

Scope:
Design & Construct

Capacity of Plant:
3l/s

Contract Start Date:
8th November 2007

Contract Completion:
31st October 2008

EPS Environmental as an Associate Delivery Partner for Scottish Water’s Q&SIIIa period developed the design of 12 Low Pressure Alleviation Schemes.  These schemes, located throughout Scotland, were required to increase the pressure of the potable water supply and generally only affected a small number of houses on the network (between 5 and 25). Certain properties within the Nant Drive (Oban) distribution system suffered from low pressure water supply.  The installation of a booster pumping station was proposed to ensure that all properties connected to the distribution system receive water at or above the reference level of 15m as per the Scottish Water specification.  EPS Environmental undertook the complete detailed design, manufacture, supply, installation, testing and commissioning of a skid mounted booster pump set and associated control panel to be installed in a kiosk in the vicinity of Nant Drive. 

  • Installation of new kiosk complete with all ancillaries.
  • Installation of 2 No Multi stage Booster pumps, pipe-work, valves & pressure transducers.
  • Installation of Hydro MPC Control panel for the pumps 
  • Supply and install telemetry outstation

Related Information:

Case Studies

Kilmelford WTW

This scheme in rural Oban consisted of removal and replacement of the existing GAC WTW with new turnkey Nanofiltratio

Peterhead SPS No. 3

EPS Environmental as an Associate Delivery Partner for Scottish Water’s Q&SIIIa period was awarded the refu

Campbeltown WwTW

Scottish Water (SW) identified the need for long term investment to reduce the flooding in Campbeltown and storm spil

Latest News

Farrans/EPS win Wateraid Quiz Scotland
16 Dec 2011
The Farrans EPS team have won the 2011 Scottish Region Wateraid Quiz at the Dunb…
EPSE complete the Design and Construction of new LV switchboards for Power Stations as part of ESB Liffey Stations replacement contract
28 Nov 2011
EPS Environmental Ltd completed the design and construction of new LV switchboar…
EPSE complete the Refurbishment of 10 No. South East Water Booster Pump Stations with works progressing at a further 2 No.
26 Oct 2011
EPS Environmental has successfully completed the refurbishment of 10 No Booster …
  • Projects
  • Design & Construct
    • Kilmelford WTW
    • Peterhead SPS No. 3
    • Campbeltown WwTW
    • Carbarns WwTW
    • Donnybrewer WwTW
    • Elsrickle and Dolphinton
    • Nant Drive WSZ Booster Pu
    • Garstings Hill WPS
  • Power, Control & Automation
    • North Coast WwTW Pumping
    • 7 Villages WwTWs Upgrade
    • Castlebar Sewerage Pumpin
    • Waterford WwTW
    • Sligo WwTW
    • Enniskillen WwTW
    • Meath Group WwTW Scheme
    • Killsellagh WTP
    • Campbelltown Sewage Schem
    • Downpatrick WwTW
  • HV & LV Switchgear
    • 2MVA package sub-stations
    • 5000A LV panel for new pr
    • New Main LV switchboard f

Head Office Northern Ireland, Derryloran Industrial Estate, Cookstown, Co Tyrone, BT80 9LU

Scottish Office, Oakbank, Midcalder, Livingston, EH53 0JS

Email: info@epsenvironmental.co.uk, Call:028 8676 1277

Contact EPS Environmental Web Design Northern Ireland by Reflex Studios